Is there a way to update a reference to another Mathcad sheet without deleting then re-inserting the reference?
I've got a library of routines, and sometimes data that I store as Mathcad sheets. I insert them as references.
If I edit a referenced sheet, the changes are not recognized in a sheet that references the edited sheet unless I delete the reference and then re-insert it.
desertgeek
I've got a library of routines, and sometimes data that I store as Mathcad sheets. I insert them as references.
If I edit a referenced sheet, the changes are not recognized in a sheet that references the edited sheet unless I delete the reference and then re-insert it.
desertgeek